There's a new amendment to the UK Wiring Regulations, and if you've seen it mentioned online, you might be wondering whether it affects your home. The honest answer for most homeowners is: probably not much. Amendment 4 is a genuinely important update, but it's aimed at specific, narrower areas rather than domestic electrics generally.
What's Actually Changing
Amendment 4 introduces updated requirements covering battery storage systems, Power over Ethernet (PoE) installations, earthing arrangements for ICT (information and communications technology) equipment, and electrical installations in medical locations.
EICR report format itself has changed - FI (Further Investigation) no longer makes a report “unsatisfactory” on its own (only C1/C2 do now)
EICR vs EIC distinction tightened - an EICR can no longer be used to cover a consumer unit replacement; that’s now explicitly an EIC job
New six-monthly RCD/AFDD testing guidance must be included in every report
Landlord rule (England): remedial work flagged in a report must be completed within 28 days
Who This Genuinely Affects
Anyone due an EICR - homeowners, buyers and sellers in the middle of a property transaction, and anyone renewing an existing certificate. The report you receive will look and read differently from before.
Landlords specifically. The 28-day remedial rule is a real compliance deadline, not a formality - if a report flags work, the clock starts the moment it’s issued.
Anyone planning a consumer unit upgrade. Make sure whoever quotes the job is clear it’s an EIC, not an EICR - the distinction matters for what the paperwork actually certifies.
Battery storage and green energy installers: those fitting home battery or solar-plus-battery systems need to work to the new requirements.
Security, fire, and data trades: PoE circuits used for CCTV, access control, and networked fire alarms fall under the updated earthing and installation rules.
Commercial medical premises: the medical locations requirements mainly affect dental practices, clinics, and care homes.
What This Means for You
If you’re due an EICR - for a sale, a purchase, a rental property, or simply because it’s time - the report itself will look a little different: a split pass/advisory structure, possibly photos attached, and clear guidance on ongoing testing. None of that should alarm you; it’s a clearer document, not a stricter one.
If you’re a landlord, the real change is practical: anything flagged now carries a 28-day clock to get it sorted, so it’s worth booking remedial work in promptly rather than letting it sit.
If you’re having a consumer unit replaced, make sure it’s being certified correctly as an EIC rather than folded into an EICR.
And if you’re considering battery storage, solar, or running a clinic, dental practice, or care home, confirm your installer is current with the amendment before work starts.
MS Electrical Solutions holds current BS 7671 certification through its NAPIT accreditation and covers Horley, Crawley, Reigate, Redhill, and the surrounding Surrey and West Sussex area, including commercial premises.
Frequently Asked Questions
Will my EICR look different now?
Yes. Reports issued under Amendment 4 split findings into urgent (C1/C2) and advisory (C3/FI) tables, can include photos or thermographic images, and must include new guidance on six-monthly RCD and AFDD testing.
Can an EICR cover my consumer unit replacement?
No - not anymore. An EICR reports on the condition of your existing installation; a consumer unit (fuse board) replacement is certified separately on an EIC. If a quote mixes the two up, it’s worth asking for clarification.
I’m a landlord - what’s actually changed for me?
Any remedial or investigative work flagged on a report must now be completed within 28 days. It’s a genuine compliance deadline, so don’t let a flagged EICR sit unactioned.
Does Amendment 4 affect my home if I don’t have solar, battery storage, or a PoE/security system?
The format of your EICR has changed regardless, but the deeper technical changes (battery storage, PoE, medical locations) only apply if you have those systems.
Do I need to do anything for solar or battery storage?
Confirm the installer works to the current amended standard, especially given plug-in solar rules that become legal from 27 August 2026.
Is MS Electrical Solutions up to date with this amendment?
Yes, through its NAPIT accreditation, for domestic and non-domestic work.